Cutting fab electricity and Scope 2 with machine-learning facility control

Models of chiller, exhaust and clean-room air systems found energy savings without any risk to wafer quality, and the savings were measured and verified in the client's carbon accounts.

Client
Leading memory manufacturer, two 300mm fabs
Solution
Carbon Emissions Calculation
Duration
18 weeks
Team
6 consultants: facility engineering, ML, carbon accounting
−9.4%
facility electricity use
62 kt
CO₂e avoided per year
< 9 mo
payback
0
excursions in clean-room spec

01 / The challenge

Facility systems run conservatively because the cost of a clean-room excursion is huge. Set-points had not been revisited since the fabs were commissioned.

Leadership had committed to a renewable-electricity and absolute Scope 2 target, and efficiency had to deliver part of it.

02 / Our approach

  1. 01

    Facility data twin

    Two years of building-management data, weather and production load combined into a model of each subsystem.

  2. 02

    Safe optimisation

    Set-point recommendations within limits defined by facility engineers, with automatic rollback on any drift.

  3. 03

    Measurement & verification

    IPMVP-style baselines so the savings could be recognised in the emissions inventory.

  4. 04

    Operator workflow

    Recommendations delivered in the facility control room's existing tools, approved by engineers before going live.

03 / Technology

  • Azure Data Explorer
  • XGBoost
  • Bayesian optimisation
  • BMS / SCADA integration
  • IPMVP
“The engineers kept full control, and the model kept finding savings they hadn't been able to justify trying.”
Director of Facilities, memory manufacturer

Bring us your hardest planning or carbon question.

A 45-minute working session with a partner and a data scientist from your industry. No slides, just your problem and how we would approach it.