01 / The challenge
Sales forecasts were built bottom-up by account managers and were consistently optimistic in upturns and pessimistic in downturns. Capacity decisions were taken months before demand was visible.
During the industry correction, the foundry needed to decide which customers and technologies to prioritise on lithography and implant tools that were in short supply.
02 / Our approach
- 01
Pipeline conversion model
Each design win was scored for probability and timing of ramp, using historical conversion by customer, application and node.
- 02
Node-level forecast
Probabilistic forecasts by technology and mask layer, translated into tool-hours on the bottleneck tool groups.
- 03
Allocation optimiser
A mixed-integer model allocated constrained capacity by contribution margin, contract commitments and strategic weight.
- 04
Monthly cadence
Embedded in the foundry's S&OP, with a single forecast shared by sales, fab operations and finance.
03 / Technology
- AWS SageMaker
- PyTorch
- OR-Tools
- Snowflake
- Kinaxis
- Streamlit
“We went into the downturn with a plan for every scenario instead of a single forecast we already knew was wrong.”