01 / The challenge
OEM electronic data interchange (EDI) call-offs changed daily and were systematically inflated during the chip shortage. Planners corrected them by hand in spreadsheets, and each plant used its own logic.
Inventory had grown by 30% in two years while premium freight costs were at a record high: too much of the wrong stock, too little of the right stock.
02 / Our approach
- 01
Call-off de-biasing
Models learned each OEM's historical order-to-actual behaviour by programme and horizon, turning noisy call-offs into a calibrated signal.
- 02
Probabilistic ensemble
Gradient-boosted trees and temporal neural networks produced P10–P90 forecasts, reconciled from SKU to plant to customer.
- 03
Safety-stock policy
Multi-echelon optimisation set stock levels by service-level target and forecast uncertainty rather than fixed weeks of cover.
- 04
Planner adoption
An explainability view and a structured override workflow, with overrides measured for value-add each month.
03 / Technology
- Azure ML
- LightGBM
- Temporal Fusion Transformer
- SAP IBP
- MILP (Gurobi)
- Power BI
“The planners stopped arguing with the forecast and started arguing with the exceptions. That's where their time should go.”