Case studies
Work that is in production, with results we measured.
A selection of recent engagements. Clients are anonymised at their request; the methods, timelines and measured outcomes are reported as delivered.
6 studies
- 11 wks
to first audit-ready inventory
Semiconductor · Carbon Emissions Calculation
An audit-ready Scope 1–3 inventory for a 300mm fab network
We replaced a spend-based estimate with a tool-level carbon model covering process gases, energy and the purchased-materials supply chain, and it passed limited assurance in its first year.
- −31%
forecast error (wMAPE)
Automotive · Demand Forecasting & Optimization
Demand sensing across 40,000 SKUs for a Tier-1 automotive supplier
A probabilistic forecasting engine fed from OEM call-offs and production schedules cut forecast error by almost a third and released significant working capital without hurting service.
- 100%
of pack variants with declared PCF
Automotive · Carbon Emissions Calculation
Regulation-grade carbon footprints for EV battery packs
We built a cradle-to-gate footprint model for every battery pack variant, using supplier primary data for cells and materials, ahead of the EU Battery Regulation's carbon footprint declaration.
- +6 pts
bottleneck tool utilisation
Semiconductor · Demand Forecasting & Optimization
Capacity and wafer-start planning for a mature-node foundry
Linking design-win pipelines to a probabilistic demand model and an allocation optimiser improved bottleneck utilisation while protecting strategic customers during a downturn.
- −9.4%
facility electricity use
Semiconductor · Carbon Emissions Calculation
Cutting fab electricity and Scope 2 with machine-learning facility control
Models of chiller, exhaust and clean-room air systems found energy savings without any risk to wafer quality, and the savings were measured and verified in the client's carbon accounts.
- +4.1 pts
first-pick parts availability
Automotive · Demand Forecasting & Optimization
Aftermarket parts forecasting and stocking for a global OEM network
Intermittent-demand models and multi-echelon optimisation lifted parts availability while reducing stock, for 180,000 part numbers across 30-year product lifecycles.
Have a problem like these?
A 45-minute working session with a partner and a data scientist from your industry. No slides, just your problem and how we would approach it.